Reducing risk with new plant equipment
Constructing a major new power plant is a high-risk, capital-intensive project. Our client, an established power plant operator in India, wanted support with the supply of equipment. Assets would come to the plant from Chinese vendors.
Getting an offshore crane working safely again for Centrica Energy.
Getting an offshore crane working safely again. Swift, integrity lifting engineering solutions for an ongoing client’s operations. Read our case study.
Case Study: Royal HaskoningDHV and BIM
LRQA's Building Information Modelling Level 2 accreditation is helping improve project delivery at Royal HaskoningDHV
LRQA certifies Grab to ISO 9001:2015
Grab and LRQA pave the way with ISO 9001:2015 certification. Early certification to ISO 9001:2015 demonstrates quality leadership. Read our case study.
Learning fast to export plant generators
Our client, a major North American power plant equipment supplier, needed to deliver a new piece of business. It wanted to export six heat recovery steam generators, manufactured in the US and Asia, to India.
Treating Mexico City’s wastewater
Inspection of critical, heavy equipment for the world’s largest wastewater plant. A National Water Commission (CONAGUA) vision. Read the case study.
Welding engineering support saves client time and money.
This support assisted the client by increasing efficiency and highlighted potential improvements and enhanced methods that could be adopted for future jobs
Apache: acheiving global geoscience collaboration.
We worked with Apache Corporation's geoscientists to implement a customised LRQA IP platform enabling them to share and analyse subsurface data company-wide.