Aker BP: Using data intelligently to cut planned maintenance in half.

Date: 5 Apr 2019

Optimising the maintenance of an FPSO's centrifugal pumps and fire and gas detectors using our maintenance optimisation solution.

Oil & Gas
Energy
Offshore Wind
Marine & Shipping

Designing & permitting a Liquid Natural Gas storage facility.

Date: 22 Nov 2017

SGC teamed with Northstar Industries of Methuen, Massachusetts to design and permit an 814,000-gallon natural gas storage tank on 55 acres in the Colorado wilderness.

Learning fast to export plant generators

Date: 22 Nov 2017

Our client, a major North American power plant equipment supplier, needed to deliver a new piece of business. It wanted to export six heat recovery steam generators, manufactured in the US and Asia, to India.

Treating Mexico City’s wastewater

Date: 22 Jan 2018

Inspection of critical, heavy equipment for the world’s largest wastewater plant. A National Water Commission (CONAGUA) vision. Read the case study.

Case study: Giving TEPCO the confidence to restart nuclear reactors

Date: 22 Nov 2017

Independent technical audits for the world’s largest nuclear power plant, Japan, enabling restart following the Fukushima tsunami. Read more in our case study.

Case Study
Energy
Nuclear
Sustainability

Woodside: Fitting a large rig deck by ‘float-over’ method.

Date: 22 Jan 2018

Fitting a large rig deck by ‘float-over’ method. Independent validation of design, construction and installation. Read our case study.

BP: Bringing Gulf-of-Mexico-style offshore design to the North Sea.

Date: 22 Nov 2017

Bringing Gulf-of-Mexico-style offshore design to the North Sea. Independent verification under UK Safety Case Regulations. Read our case study.

Saving weeks of refinery downtime and $25 million.

Date: 22 Nov 2017

Saving weeks of refinery downtime and $25 million. Finding better ways to repair cracks in coke drums. Read more in our case study.

Tapping into 640 million more barrels of oil at Clair field.

Date: 22 Nov 2017

Tapping into 640 million more barrels of oil at Clair field. Independent verification services for two new bridge-linked platforms. Read our case study.

Behind a multi-billion investment in offshore drilling.

Date: 22 Nov 2017

Behind a multi-billion investment in offshore drilling. Due diligence reporting to value highly complex technical assets in a month. Read our case study.