We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

Showing 1-10 of 58 results
Most relevant

SICcast: A certification first for German engineering.

Date: 22/11/2017 12:00:00 AM

A first for German engineering. SICast gains early certification to ISO 9001:201, driving competitive advantage globally. Read more in our case study.

Automotive & Engineering
Quality
ISO 9001

Terex Trucks: Setting industry firsts for enhanced business.

Date: 22/1/2018 11:00:00 PM

Setting industry firsts. Certification to revised quality and environmental standards, ISO 9001:2015 and ISO 14001:2015. Read more in our case study.

Manufacturing
Construction Industry
Environment
ISO 14001

Achieving 96.7% mechanical reliability for a chemical plant.

Date: 22/1/2018 11:00:00 PM

Achieving 96.7% mechanical reliability for a chemical plant. The business and safety benefits of risk-based inspections (RBI). Read our case study.

BAE Systems: Elevating operational excellence and employee well-being

Date: 23/10/2023 9:00:00 AM

Partnering with LRQA for ISO 45001 certification and ISO 45003 guidance, BAE Systems Rochester has always been at the forefront of innovation and their commitment to continuous improvement and employee welfare hasn’t wavered.

Manufacturing
Health & Safety Assurance
ISO 45001
ISO/FDIS 45003

Case Study: Hill International gets certified for ISO 19650 (BIM)

Date: 18/5/2023 1:00:00 PM

Hill International, UAE achieved their ISO 19650 certification from LRQA. This demonstrates Hill's building information modelling system follows a robust and globally recognised approach.

Case Study
Construction Industry

Thales UK: Seeing what’s on the environmental horizon and acting.

Date: 22/1/2018 11:00:00 PM

Seeing what’s on the environmental horizon and acting. Gap analysis to help meet revised standard, ISO 14001:2015. Read more in our case study.

Energy
ISO 14001

Doubling power plant production with LRQA

Date: 22/11/2017 12:00:00 AM

Design appraisal and inspection services to convert a fossil-fired power plant to a Combined Cycle Gas Turbine (CCGT) plant. Read more in our case study.

Making a European power plant out of components from Asia.

Date: 22/11/2017 12:00:00 AM

Our client needed to be confident about the technical quality control process of its main Engineering, Procurement and Construction (EPC) contractor in Asia.

From textile equipment manufacturer in China to global market leader.

Date: 22/11/2017 12:00:00 AM

From their first days of manufacture, we have worked alongside our client in China to support their ambitious vision.

Case study: Installing a converter platform (TenneT)

Date: 22/11/2017 12:00:00 AM

Converting offshore wind power at sea and transmitting it to shore. Acting as the certifying authority for safe installation of the BorWin gamma platform.

Case Study
Energy
Offshore Wind
Sustainability
Can't find what you are looking for?