We operate the Water Industry Registration Scheme (WIRS) on behalf of water utility companies and the WIRSAE accreditation on behalf of Market Operator Services Ltd (MOSL) and water wholesalers.

A WIRS accredited self-lay organisation may perform works on the connection of water mains and supplies to a property, dependent on the status and scope of accreditation.

A WIRSAE Provider contracted by retailers to carry out accredited work (as defined in the Wholesale Retail Code and detailed in the generic code of practice supplemented by adopting utilities addendums) can be accredited under this scheme. Those Adopting Utilities within England that recognise this scheme will allow WIRSAE Providers that hold the appropriate scopes of accreditation to tender for, and if successful undertake temporary / permanent disconnections and meter installation / replacement works.

Find a WIRS accredited self-lay organisation or WIRSAE provider

1 232 232 results

Filter by

  • CPL Pipelines Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Mr Robert Shutler

  • EOS Solutions UK Plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    ARMIM Temp disconnections/reconnections

    Contact

    Steve Ridge

  • Heartland Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Saskia Hall

  • Engage Services (ESL) Limited - WIRSAE

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Michael Wolfenden

  • Anparo Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Adam Ferrand

  • Network Plus Multi Utility Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    John Walsh

    Contact

    Rachel Moore

  • SAS Utility Services Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mr Stephen Smith

  • Hydrosave UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Mr Keith Lewcock

  • Gattica Associates Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mihaela Gafita

  • Complete Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Damon Goodwin

  • Fusion Utility Networks

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Spoors

  • Advance Utilities (Scotland) Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    David Callaghan

  • McFadden Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Sean Staines

  • PBU (UK) Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Kevin Wilkinson

  • SmOp CT Ltd (trading as SmOp Cleantech)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Craig Morton

    Notes

    Civil Works - Excavation and Backfill to Tile Tape Level

  • Utility Infrastructure Solutions - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Grayson

    Notes

    GIRS:- Connections (Non-Routine) Basic - Recommended for partial certification (restricted to work up to 2Bar only)

  • GS Energy Connections Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Danny Dunstan

  • Blu-3 (UK) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Estimating Department

  • Terrafirma Pipeline Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ivor Wells

  • Bottom Groundworks & Plant Hire Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Brian Campbell

  • J Murphy and Sons Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Gary Mullaney

    Notes

    Full accreditation for Substation Layouts (11kV, 20kV, 33kV – restricted to 33kV switchgear)

  • Draper Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Edward Parv

  • McAndrews Utilities and Civil Engineering

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Sean McAndrew

  • Hulley and Kirkwood Consulting Engineers Ltd

    Regions Scotland

    WIRS

    Design

    Contact

    William Fitzpatrick

  • North West Multi Utilities Preston Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ann Louise Degnan

  • Energy Assets Utilities Ltd (England and Wales) - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Smith

  • Alexander James Contracts Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

  • Pascon Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Joy Smith

  • DaCI Utilities Engineering Consultancy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mohammad Hasan

  • Avove Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Liz Groundland

  • John Gunn & Sons Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ian Gunn

  • F W Huxter Groundworks and Civil Engineering Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • PJ Carey (Contractors) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Larham

  • AC Water Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Claire Lineham

  • Reach Active Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

  • JN Civils Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Antony Livingstone

  • OCU Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Dale Welton

  • Seivwright Brothers Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alasdair Seivwright

  • Morrison Data Services - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    ARMIM Temp disconnections/reconnections

    Contact

    Mr Matthew Barnes

  • Matrix Networks Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Paul Beck

  • Mac Civils Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Water Supply Surveys Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stephen Elliott

  • Flowaime Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Andrea Wright

  • FES Support Services Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Chris Mack

  • S&R Construction Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Wayne McDonald

  • CLC Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Hall

  • Sustainable Energy Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andrew Holland

  • Natta Building Company Limited - MURS accredited

    Regions Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Utilities

  • GF Job

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ruaridh Stuart

  • Infrastructure Gateway - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Ben Brownbill

  • Billy Miller Contractor & Plant Hire

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Brad Robert Macleod

  • Ameon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Martin Quinn

  • Nexus Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    John Gaughan / Stephen Gaughan

  • Rosgal Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • SNR Eng Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Richard Kibbler

  • PWG Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Notes

    Network Connections Operational – LV and 11kV (includes 20kV) Network Connections Jointing – 11kV mains and 11kV Terminations (includes 20kV)

  • MCD Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Donovan Aylott

  • Dewhurst Utility Services Ltd -MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Jason Critchley

    Contact

    Bill Jones

  • Rogers Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mr James Rogers

    Notes

    Full Scopes Construction Only - Excludes Project Management

  • OCU Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Donovan Aylott

  • Nicol of Skene Ltd - MURS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Peter-Jon Cowe

  • DJM Services (Pembs) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Darrell Lewis

  • ARC-Tech MU Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Ben Bowring

  • Phoenix Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

    Contact

    Mr Kenny Nicol

  • Ipswich Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Jordan Thomas

  • Waterco Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Accounts

  • Shadow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • J.S. Pipelines Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Jamie Smith

  • Energy Assets Utilities Ltd (Scotland) - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Smith

  • Interactive Contact & Resolution Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 32mm φ)

    Contact

    Richard Denny

  • Jardine Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Tom Jardine

  • W M Donald Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Rachel O’Donnell

  • Davidson Land Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Malcolm Davidson

  • Green Frog Utilities

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Green Frog Utilities

  • WSP UK Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Tim Knobbs

  • JPS Utilities (Scot) Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lesley Allan

  • Springfield Properties Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

    Contact

    Alasdair Mackie

  • IES Utilities Group

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    John McCann

  • WaterWise Utilities Ltd (formerly DS Construction (Scotland) Ltd )

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Prestige Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Amjutan Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, To be advised, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mr Justin Woodbridge

  • Multi Connex Networks Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Arcadis Consulting (UK) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Gareth Thompson

  • Barhale Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Kelly Waters

  • Fincher Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Balfour Beatty plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Steve Crossland

  • Pressure Test scotland (Water) Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    David Connell

  • Allan Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Cameron Munro

  • MCU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mick Coleman

    Notes

    NERS Cable Laying (LV) *restricted to hand pull only

  • Total Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Catherine Rowlands

  • Quantum Power Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Notes

    Full Accreditation for Excavation and backfill to tile tape level as relevant to cable lay scopes – Civil Works

  • TGL Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Kier Integrated Services Ltd

    Regions Scotland, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    KIS Proposals

  • Express Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kerry McDade

  • Complete Moling Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Adam Thompson

  • DAM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Anthony Cauchie

  • BGS Utilities (Birchwood Gas Service Limited) - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Jonathan Hopkins

  • Cybi Cyf

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Harri Pritchard

  • Electricity Asset Service Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Stewart Herron

  • EEMU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • Versatile Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Wayne Gould

  • Erith Connect Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • UBCivils Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Colin Peteranna

  • ML Water Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Richard Moffat

  • Onsite Central Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Catherine Henderson

  • TriConnex Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Hannah Smith

  • Radius Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sophie Cleverley

    Contact

    Chris Alker

  • Sapphire Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    John Glover

    Notes

    Full Accreditation - Excavation and backfill to tile tape level (Civil Work) as relevant to Cable Laying – LV. Partial Accreditation - Excavation and backfill to tile tape level (Civil Work) – as relevant Cable Laying – 20kV, 33kV

  • Civils Plus Plant and Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Rachel Carroll

  • Self-Lay Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Toby Judge

  • Skanska Construction UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Raj Kumar

  • Energetics, Design and Build Limited - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    NERS/GIRS - Andrew Finch WIRS - Lee Crabtree

    Notes

    Civil Works associated with the following scopes: Cable Laying (LV, 11kV, 20kV) Cable Jointing (LV Dead, LV Live, 11kV, 20kV) Substation Installation (11kV, 20kV)

  • Shannon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Ben Webb

  • Utility Solutions Provider Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neal Cowdell

    Notes

    NERS Tier 2 Provider

  • Beehive Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Tyson Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Lynn Beman

  • Utilities Direct Limited

    Regions East Anglia, Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Loretta Gobbey

  • J Geraghty Limited

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Jonjo Geraghty

  • Multi Utility UK - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alister Cameron

    Notes

    Accreditation includes Full Design of LV Cable Networks to Industrial and Commercial premise. WIRS accreditation includes CMS Construction of Mains and Services (All Works), CMRC Construction of Routine Mains Connections and Design. GIRS Accreditation includes CNRB, CCCR and Design.

  • Megson Utilities Limited - MURS accredited

    Regions Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Megson

    Notes

    (Civil Work) – as relevant to Construction: Cable Laying – LV, 20kV.

  • M&S Water Services (Utilities) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Thomas Harkin

  • Radius Subterra

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Garvan Kelly

  • FCH Construction Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Fraser Hart

  • L J Heffernan Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Luke Heffernan

  • CX Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Paul Hardy

  • NG Tunnelling Ltd

    Regions East Anglia, South East

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Peter Gallagher

    Notes

    13/06/2024 Suspended

  • AIM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Simon Barton

  • Morrison Water Services

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andy Stephenson

  • Fastflow Pipeline Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Carolan

  • Vital Energi

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Medi Rampal

    Notes

    All Substation Installation works are restricted to switchgear only

  • Pat Munro (Alness) Limited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Gary Clark

  • Cascade Water Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    Contact

    Matthew Hedges

  • Capelwood Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Hannah Cafferkey

  • Balfour Beatty Utility Solutions Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Notes

    Water enquiries Kathryn Vowles, contact details as above. Gas enquiries Willie Duncan, contact details as above.

  • Pivotal Energy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Amie Norton

  • Morris & Bert Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Morris

  • Power On

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    PM

    Design

  • Stantec UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Paul Kalungi

  • DWD Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Daryl Stockton

  • Aptus Utilities - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    enquiries team

    Notes

    Includes design related to a pole mounted transformer when such is a “one off situation” and relevant to networks within GIRS Connections (Non-Routine) Basic - Recommended to retain Full certification (*CNRB is restricted to construction and connections up to 2Bar) - NERS - UCP accredited scopes.-Excludes any other work related to O/H –Design or construction. Includes design and construction of 20kV Distribution sub stations- Coverage: Restricted to and as agreed by CE area only. Project Management O/H Line wood pole work restricted to pole and PMT installation- excludes any other line installation work.

  • Longsword Building and Maintenance Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Pipework Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Tom Vallely

  • GW Cockburn Water and Drainage Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr Gary Collins

  • Hydrotech Water Services UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sebastian Youde

  • SES Home Services Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    Contact

    Peter Holmwood

  • TSL Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Robert Forbes

  • Dig & Connect Water Services Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mark Aldous

  • Aquamain (UK) Ltd

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Luke Welch

  • Fulcrum - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Customer Care

  • I Y Commissioning Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Ian Young

  • Perch Verify Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

  • Mott Macdonald

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Stephen Kirby

  • JWA Pipework Solutions Ltd

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jay Ashford

  • E&H Building Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Drewie Manson

  • GTC Infrastructure Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

  • Water and Pipeline Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Donald Stocks

  • Claret Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Potter

  • Utilitest Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alan Macmillan

  • AS-Utilities Scotland Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Scott Peters

  • J. McCann & Co. Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Total Pipeline Technology Civil Engineering Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Creamer

  • Doocey Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Ashcroft

  • Connect It Utility Services Limited - MURS Accredited

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ryan Leech

  • William Davis

    Regions Midlands

    WIRS

    CS - Construction of Services

    CS Construction of Services

    Contact

    Richard Halford

  • OPUS Utility Solutions Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Gavin O’Connor

  • CMU Infrastructure Ltd incorporating CM Utilities Ltd

    Regions Midlands, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    CMU Infrastructure Ltd incorporating CM Utilities Ltd

  • PowerTek Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Fraser Baxter

  • Tulloch Developments Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Shaun Tulloch

  • UK Power Solutions Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Brian Cooke

  • Electricity Solutions Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Bergin

  • Andrew Sinclair Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Design

    Contact

    Bruce Sinclair

  • Entity Connect

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Gethin Davies

  • High Voltage Systems and Services (HVSS)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Mr Chris Beattie

    Contact

    Mark Buckby

  • Air Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Muhammad Asfund Yar Khan

  • Innovative Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr John Mason

  • Watertight Management Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Castle

  • RPS Environmental Management Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

  • PGL Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Davis

  • Ingenious Power Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Babatunde Odemuyiwa

  • Talbot Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Talbot

  • Pipeline Associates Ltd

    Regions South East, South West

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Simon Limb

  • Alconex Infrastructure & Solutions Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kevin Wilkinson

  • Swat Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Jake Pariente

  • K M Plant Hire & Groundworks Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Murray Ambler-Shattock

  • Bethell Utility Services Ltd - MURS Accredited

    Regions Midlands, North East, North West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Sarah Standish

  • PTS Utilities Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Richard Paton

  • Hydro Utility Solutions Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mr Tim Stork

  • Network Plus Services Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • HydroVein (North Avon Group) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Special Pipeline Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mick Rice

  • A S Pipelines

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andrew Croft

  • Pro Weld

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Allan Davidson

  • Luce Bay Plant Hire Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Mulholland Contracts Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Scott Lambie

  • Applebridge Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Tomas McGleenan

    Notes

    NERS = Excavation and backfill to tile tape level as relevant to cable lay scopes (Civil Works). GIRS = CNRB Scope restricted to work up to 2 Bar.

  • DT Civils Ltd - MURS Accredited

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mike Sibley

  • JSM Group Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Darren Cooper

  • Integrated Utility Services - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Integrated Utility Services Ltd

    Notes

    Civil Works Associated with Cable Laying (LV, 11kV, 20kV, 33kV & 66kV)

  • AIS Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Andy Jones

  • Occutrace Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    ERMIM External Routine Meter Installation Maintenance

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    ERMIM - Temporary Disconnections and Subsequent Reconnections

    Contact

    Alistair Milne

  • Bregan Mainsflow Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Glenn Brett

  • Harlaxton Engineering Services Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Richard Hibbert

    Contact

    Lucy Hibbert

  • Morrison Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Iain Mitchell

    Contact

    Drew Mackie

  • PN Daly Ltd - MURS ACCREDITED

    Regions Midlands, North East, North West, Scotland, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Patrick Daly

  • Chapman Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Paul Chapman

  • Global Infrastructure Scotland Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Tanya Bartlet

  • Utility Pro Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CRMC Construction of Routine Mains Connections

    Contact

    DARRYL WALSH

    Notes

    Client has full accreditation at Cable Jointing underground related

  • Networx Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Matt Brimicombe

  • GasDesign Utilities Ltd Trading as GDUK (Utilities)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Andy Ginn

  • The Clancy Docwra Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Malcom Hazel

    Notes

    .

  • Excalon Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Danny Wilson

Error

Error

No results found

No results found that match your query

Loading results

Approval Key

full approval

Scopes highlighted in green are fully accredited.

partial approval

Scopes and Services highlighted in blue are for partial approval meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval due to expire

Scopes highlighted in yellow are fully accredited but are due to expire in less than one month.

gap analysis

Scopes highlighted in aqua are for GAP Analysis, meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval expired

Scopes highlighted in fuchsia have now expired or have been suspended.

bim ready

BIM Providers who can demonstrate that they have met the requirements of the BIM Guidance document and the referenced standards but do not currently have BIM projects against which they can demonstrate the implementation of those standards

    WIRS Scopes

    Design

    CMS Construction of Mains and Services - All works
    Covers off-site work and on-site work with pipe diameters over 355mm diameter

    CMS Construction of Mains and Services - Site works only
    Covers work on development sites with mains up to 355mm diameter

    CMS Construction of Services on Development Sites
    This scope covers service laying on connections not exceeding 63mm diameter (OD) including services to new on-site mains laid by others.

    PM
    Procedures in place to manage the work and use companies holding construction accreditation.