
Make sure you're meeting India's requirements.
If you're exporting to India, you need to know about the Indian Boiler Regulations (1950). LRQA has the expertise to make sure you're compliant.
Indian Boiler Regulations
Overview
The Indian Boiler Regulations (IBR) cover material and equipment used to make steam boilers in India. Domestic and overseas manufacturers and suppliers of most steam boilers and associated components built for India must comply.
The IBR was created in 1950 to enforce section 28 and 29 of the Indian Boilers Act of 1923. It covers the following areas:
- Boilers – including feed piping from the discharge side of the feed pump and steam piping up to and including the stop valve of the steam consumer and attached fittings or vessels
- Steam receivers, separators, steam traps, accumulators and similar vessels
- Heat exchangers, converters, evaporators and similar vessels in which steam is generated
The Indian government strictly enforces the IBR. It is not possible for any boiler material or equipment to be imported into India unless it is accompanied by a certificate that confirms it meets the IBR standards and criteria.
This certificate must be endorsed by an inspecting authority designated by the Indian government.
Need help with IBR?
If you need compliance for your equipment to the IBR, we can help. We are the leading international "one stop shop" for IBR services.
LRQA is recognised by the Central Boilers Board in India as a “competent authority” and “inspecting authority” for IBR in India and around the world. That means we are able to provide IBR inspectors with the correct experience to help manufacturers meet the IBR criteria for:
- Design appraisal
- Sourcing material
- Manufacturing component parts
- Site erection
- Commissioning and periodic in-service inspections
Our Competent Persons can carry out all five stages of the IBR inspection process. Learn more about them here.
Why work with us?
Accreditation and Experience
LRQA has been involved in inspecting equipment to the Indian Boiler Regulations since the government opened the market to third-party inspection agencies. LRQA was the first business allowed to certify equipment to the IBR outside of India.
Technical expertise
LRQA's technical experts can provide first-hand insights into the requirements of the IBR and the logic behind them. Our surveyors are chosen for their sector-specific knowledge and expertise, which means you can be confident that they'll understand the manufacturing challenges you face.
CASE STUDIES
-
BAE Systems: Elevating operational excellence and employee well-being
Case Study
Discover BAE Systems Rochester's dedication to operational excellence as they partner with LRQA for ISO 45001 certification and...
Read more -
Adding flexibility through remote inspection.
Case Study
Read how our remote inspection saves one client more than 50% in inspection cost.
Read more -
Enerpac: How remote inspection led to better customer experience....
Case Study
When Enerpac needed a more flexible inspection solution to meet its client needs, LRQA responded with remote inspection...
Read more -
Turboden:Taking risk-based thinking into clean electricity generation.
Case Study
Taking risk-based thinking into clean electricity generation. Certification to ISO 9001:2015 to better identify risks and opportunities. Read...
Read more -
Terex Trucks: Setting industry firsts for enhanced business....
Case Study
Setting industry firsts. Certification to revised quality and environmental standards, ISO 9001:2015 and ISO 14001:2015. Read more in...
Read more -
Treating Mexico City’s wastewater
Case Study
Inspection of critical, heavy equipment for the world’s largest wastewater plant. A National Water Commission (CONAGUA) vision. Read...
Read more -
Iveco Trucks: Moving first to a new quality management...
Case Study
Certification to ISO 9001:2015 revised quality management standards for greater competitive positioning. Read more in our case study.
Read more -
Meeting global specifications
Case Study
Making heavy engineering equipment for export to 80 countries with third-party certification and conformity assessment. Read how in...
Read more -
A first for bolted joints: Hydratight and LRQA
Case Study
Setting a benchmark for training bolting flange joint technicians with an independent audit to ASME PCC-1-2013 Appendix A....
Read more
Want to know more about this service?
INSIGHTS
-
The importance of the right risk management partner
Article
Risk has become a sharper instrument in today’s operating environment, increasingly visible, connected and unforgiving of complacency.
Read more -
Engineering quality: Why it starts long before certification
Article
As we mark World Quality Day, it’s the perfect moment to reflect on what quality truly means today.
Read more -
The quality mindset: Connecting risk, culture and performance to...
Article
In celebration of World Quality Week, LRQA’s latest Future in Focus podcast brings together two of our leading...
Read more