Putting the environment on a region’s daily agenda
Putting the environment on a region’s daily agenda. Certification to revised environmental standard, ISO 14001:2015. Read more in our case study.
Providing Engineering Support to the SCHOTTEL Hydro Triton Tidal Power
Taking designs further to harness tidal power, Bay of Fundy. Structural analysis, design codes and standards review. Read more in our case study.
Windflow: Novel wind turbines
Type approval to international standards of Windflow’s two-bladed turbines, and review and auditing of manufacturing sites. Read more in our case study.
Meeting global specifications
ISGEC supplies the domestic Indian market and exports its products globally. Key to the group’s leading status is establishing, maintaining and demonstrating a rigorous commitment to quality.
Colossal Boilers, Efficient Solutions: Larsen & Toubro's Expertise
Certification and inspection of colossal heat recovery boilers using Larsen & Toubro’s latest fabrication techniques. Read more in our case study.
Case study: Moving novel wave energy technology closer to deployment.
Turning ocean waves into electricity with independent certification and Technology Qualification for AW Energy. Read our WaveRollerTM case study.
Kinetic Pressure Control: Providing blowout-stopping technology.
Kinetic Pressure Control: Providing blowout-stopping technology. Technology qualification to help go to market. Read more in our case study.
LRQA RiskSpectrum: Safeguarding Operational Risk at Sizewell B
LRQA's RiskSpectrum suite gives EDF Energy real-time risk monitoring capability, based on a fully validated living PSA model.
Case study - Maintenance cost and risk reduced by 55%.
Maintenance cost and risk reduced by 55%.
Katoni: Make health and safety matter.
Katoni achieves ISO 45001 with LRQA. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.