We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

Showing 10-20 of 56 results
Most relevant

Enerpac: How remote inspection led to better customer experience.

Date: 31/07/2018 6:00:00 PM

When Enerpac needed a more flexible inspection solution to meet its client needs, LRQA responded with remote inspection technology.

Case Study
Manufacturing
Industry 4.0
Connected supply chains

Shell: 3D printing quality assurance case study

Date: 13/06/2022 9:00:00 AM

Risk Through a New Lens: LRQA is supporting Shell with assurance solutions for safety-critical 3D printed parts.

LRQA certifies Grab to ISO 9001:2015

Date: 22/11/2017 12:00:00 AM

Grab and LRQA pave the way with ISO 9001:2015 certification. Early certification to ISO 9001:2015 demonstrates quality leadership. Read our case study.

Transport & Logistics
Quality
ISO 9001

Helping NGO, Terre de Hommes, help children globally.

Date: 22/01/2018 11:00:00 PM

Helping Terre de Hommes help children globally. Certification to ISO 9001:2015 redesigns the NGO’s operating structure. Read more in our case study.

Aerospace & Defence
Food, Beverage & Hospitality
Marine & Shipping
Utilities

Turboden:Taking risk-based thinking into clean electricity generation.

Date: 22/01/2018 11:00:00 PM

Taking risk-based thinking into clean electricity generation. Certification to ISO 9001:2015 to better identify risks and opportunities. Read our case study.

Reducing risk with new plant equipment

Date: 22/11/2017 12:00:00 AM

Constructing a major new power plant is a high-risk, capital-intensive project. Our client, an established power plant operator in India, wanted support with the supply of equipment. Assets would come to the plant from Chinese vendors.

Case Study: Royal HaskoningDHV and BIM

Date: 27/03/2018 8:00:00 PM

LRQA's Building Information Modelling Level 2 accreditation is helping improve project delivery at Royal HaskoningDHV

Case Study
Construction Industry

Learning fast to export plant generators

Date: 22/11/2017 12:00:00 AM

Our client, a major North American power plant equipment supplier, needed to deliver a new piece of business. It wanted to export six heat recovery steam generators, manufactured in the US and Asia, to India.

Treating Mexico City’s wastewater

Date: 22/01/2018 11:00:00 PM

Inspection of critical, heavy equipment for the world’s largest wastewater plant. A National Water Commission (CONAGUA) vision. Read the case study.

Behind a multi-billion investment in offshore drilling.

Date: 22/11/2017 12:00:00 AM

Behind a multi-billion investment in offshore drilling. Due diligence reporting to value highly complex technical assets in a month. Read our case study.

Can't find what you are looking for?