From textile equipment manufacturer in China to global market leader.
From their first days of manufacture, we have worked alongside our client in China to support their ambitious vision.
Case study: Installing a converter platform (TenneT)
Converting offshore wind power at sea and transmitting it to shore. Acting as the certifying authority for safe installation of the BorWin gamma platform.
Case study: Giving TEPCO the confidence to restart nuclear reactors
Independent technical audits for the world’s largest nuclear power plant, Japan, enabling restart following the Fukushima tsunami. Read more in our case study.
Shaping an investor’s commercial strategy.
Shaping an investor’s commercial strategy. Independent assessment and verification of offshore technical elements, Malaysia. Read our case study.
Woodside: Fitting a large rig deck by ‘float-over’ method.
Fitting a large rig deck by ‘float-over’ method. Independent validation of design, construction and installation. Read our case study.
ASC certification aids growth for Loch Fyne Oysters
Loch Fyne Oysters is a seafoods, fish, meat, oysters and game company which also founded the Loch Fyne restaurant chain
UKCloud: Leading with information security.
ISO 27018 Statement of Verification for added confidence in Cloud services. Read more in our case study.
Putting the environment on a region’s daily agenda
Putting the environment on a region’s daily agenda. Certification to revised environmental standard, ISO 14001:2015. Read more in our case study.
Providing Engineering Support to the SCHOTTEL Hydro Triton Tidal Power
Taking designs further to harness tidal power, Bay of Fundy. Structural analysis, design codes and standards review. Read more in our case study.
Training for Huadian Heavy Industries
Designing and delivering bespoke training with the RES Group for a leading Chinese EPC contractor. Read more in our case study.