We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

Showing 10-20 of 58 results
Most relevant

Shell: 3D printing quality assurance case study

Date: 13/6/2022 9:00:00 AM

Risk Through a New Lens: LRQA is supporting Shell with assurance solutions for safety-critical 3D printed parts.

Enerpac: How remote inspection led to better customer experience.

Date: 31/7/2018 6:00:00 PM

When Enerpac needed a more flexible inspection solution to meet its client needs, LRQA responded with remote inspection technology.

Case Study
Manufacturing
Industry 4.0
Connected supply chains

LRQA certifies Grab to ISO 9001:2015

Date: 22/11/2017 12:00:00 AM

Grab and LRQA pave the way with ISO 9001:2015 certification. Early certification to ISO 9001:2015 demonstrates quality leadership. Read our case study.

Transport & Logistics
Quality
ISO 9001

Helping NGO, Terre de Hommes, help children globally.

Date: 22/1/2018 11:00:00 PM

Helping Terre de Hommes help children globally. Certification to ISO 9001:2015 redesigns the NGO’s operating structure. Read more in our case study.

Aerospace & Defence
Food, Beverage & Hospitality
Marine & Shipping
Utilities

Turboden:Taking risk-based thinking into clean electricity generation.

Date: 22/1/2018 11:00:00 PM

Taking risk-based thinking into clean electricity generation. Certification to ISO 9001:2015 to better identify risks and opportunities. Read our case study.

Reducing risk with new plant equipment

Date: 22/11/2017 12:00:00 AM

Constructing a major new power plant is a high-risk, capital-intensive project. Our client, an established power plant operator in India, wanted support with the supply of equipment. Assets would come to the plant from Chinese vendors.

Getting an offshore crane working safely again for Centrica Energy.

Date: 22/11/2017 12:00:00 AM

Getting an offshore crane working safely again. Swift, integrity lifting engineering solutions for an ongoing client’s operations. Read our case study.

Case Study: Royal HaskoningDHV and BIM

Date: 27/3/2018 8:00:00 PM

LRQA's Building Information Modelling Level 2 accreditation is helping improve project delivery at Royal HaskoningDHV

Case Study
Construction Industry

Learning fast to export plant generators

Date: 22/11/2017 12:00:00 AM

Our client, a major North American power plant equipment supplier, needed to deliver a new piece of business. It wanted to export six heat recovery steam generators, manufactured in the US and Asia, to India.

Treating Mexico City’s wastewater

Date: 22/1/2018 11:00:00 PM

Inspection of critical, heavy equipment for the world’s largest wastewater plant. A National Water Commission (CONAGUA) vision. Read the case study.

Can't find what you are looking for?