Skip content

Search for a WIRS accredited self-lay organisation or WIRSAE provider

We operate the Water Industry Registration Scheme (WIRS) on behalf of water utility companies and the WIRSAE accreditation on behalf of Market Operator Services Ltd (MOSL) and water wholesalers.

A WIRS accredited self-lay organisation may perform works on the connection of water mains and supplies to a property, dependent on the status and scope of accreditation.

A WIRSAE Provider contracted by retailers to carry out accredited work (as defined in the Wholesale Retail Code and detailed in the generic code of practice supplemented by adopting utilities addendums) can be accredited under this scheme. Those Adopting Utilities within England that recognise this scheme will allow WIRSAE Providers that hold the appropriate scopes of accreditation to tender for, and if successful undertake temporary / permanent disconnections and meter installation / replacement works.

1 251 251 results

Filter by

  • The ICP

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • FCH Construction Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Fraser Hart

  • Dewhurst Utility Services Ltd -MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Jason Critchley

    Contact

    Bill Jones

    Notes

    GIRS - Connections (Non-Routine) Basic (Scope limited to projects up to 2Bar)

  • Matrix Networks Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Simon Spencer

  • Total Pipeline Technology Civil Engineering Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Creamer

  • Excalon Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Danny Wilson

  • Utility Infrastructure Solutions - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Grayson

    Notes

    GIRS:- Connections (Non-Routine) Basic - Recommended for partial certification (restricted to work up to 2Bar only)

  • O'Halloran & O'Brien Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    David Briddon

  • Trust Utility Management Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • J Geraghty Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Jonjo Geraghty

  • M X Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • Argon Utility Infrastruture Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Beth Taylor

  • JPS Utilities (Scot) Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lesley Allan

  • RPS Environmental Management Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

  • Waterco Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Accounts

  • Morris & Bert Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Morris

  • Underline Utilities & Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Michael Plausin

  • William Davis

    Regions Midlands

    WIRS

    CS - Construction of Services

    Contact

    Richard Halford

  • SAS Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mr Stephen Smith

  • BGS Group Ltd (BGS Investment Holdings Ltd.)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Hopkins

  • Jardine Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Jardine

  • Therma Mech Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alex Sargeant

  • Natta Building Company Limited

    Regions Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Utilities

  • Dwr Water Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Harri Pritchard

  • Galldris Services (trading as Galldris Construction Ltd.)

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Chris Turok-Hallam

  • Onsite Central Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Catherine Henderson

  • M.J. ABBOTT LIMITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Adrian Riggs

  • CMU Infrastructure Ltd incorporating CM Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    CMU Infrastructure Ltd incorporating CM Utilities Ltd

  • K M Plant Hire & Groundworks Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Murray Ambler-Shattock

  • F W Huxter Groundworks and Civil Engineering Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Radius Subterra

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Garvan Kelly

  • Ameon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Martin Quinn

  • Naylor Power Engineering Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Spink

  • Pipework Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Vallely

  • Quantum Power Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • IES Utilities Group

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Electricity Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Bergin

  • Rosgal Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • GTC Infrastructure Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

  • Stats Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Design

    Contact

    Neil Kempton

  • Kilkern Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Martin Gallagher

  • Watertight Management Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Castle

  • DT Civils Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Dean Sibley

  • Phoenix Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Design

    Contact

    Mr Kenny Nicol

  • Tulloch Developments Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Shaun Tulloch

  • CLC Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Freddie Box

    Contact

    Thomas Stoten

  • J.S. Pipelines Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Jamie Smith

  • HydroVein (North Avon Group) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • UK Power Solutions Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Brian Cooke

  • John Gunn & Sons Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Ian Gunn

  • Versatile Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Wayne Gould

  • Prestige Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Longsword Building and Maintenance Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • Innovative Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr John Mason

  • Pipeline Associates Ltd

    Regions South East, South West

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Dan Woolmington

  • Capelwood Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Tristan Epps

  • Firdale Construction Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • The Clancy Group Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Malcom Hazel

    Notes

    .

  • Megson Utilities Limited - MURS accredited

    Regions Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Megson

    Notes

    (Civil Work) – as relevant to Construction: Cable Laying – LV, 20kV.

  • Electricity Asset Service Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Design

    Contact

    Stewart Herron

  • Erith Connect Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • UB Civils Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Colin Peteranna

  • MCD Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Donovan Aylott

  • PowerTek Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Fraser Baxter

  • A S Pipelines

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Andrew Croft

  • Harlaxton Engineering Services Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Richard Hibbert

  • Excel Pipelines T/A ExcelCS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Mark Barnes

  • Energy Assets Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Smith

  • OPUS Utility Solutions Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Gavin O’Connor

  • Stanmore Quality Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mathew Carter

  • TGL Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Hulley and Kirkwood Consulting Engineers Ltd

    Regions Scotland

    WIRS

    Design

    Contact

    William Fitzpatrick

  • Fusion Utility Networks

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Smith

  • DJM Services (Pembs) Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Darrell Lewis

  • Networx Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Brimicombe

  • Complete Moling Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Adam Thompson

  • Mulholland Contracts Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Scott Lambie

  • Heartland Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Robert Ellis

  • OCU Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    James Probert

  • Total Utility Connections Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Catherine Rowlands

  • Terrafirma Pipeline Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CRMC Construction of Routine Mains Connections

    CMS – Construction of Mains and Services (site works only)

    Contact

    Ivor Wells

  • Aquamain (UK) Ltd

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Luke Welch

  • EOS Solutions UK Plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    ARMIM Temp disconnections/reconnections

    Contact

    Steve Ridge

  • PBU (UK) Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Kevin Wilkinson

  • Doocey Group Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    James Ashcroft

  • Infrastructure Gateway - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Ben Brownbill

  • SNR Eng Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Richard Kibbler

  • Civils Plus Plant and Utilities Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Rachel Carroll

  • Pipeline Energy Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Notes

    NERS Tier 2 Company

  • Barhale Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Kelly Waters

  • TSL Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Robert Forbes

  • JRN Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James Nelson

  • Pro Weld

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Allan Davidson

  • JWA Pipework Solutions Ltd

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jay Ashford

  • L J Heffernan Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Luke Heffernan

  • Alexander James Contracts Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Claret Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Kevin Potter

  • Pat Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Gary Clark

  • Shannon Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ben Webb

  • Aptus Utilities - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Enquiries Team

    Notes

    GIRS Connections (Non-Routine) Basic - restricted to projects up to 2 Bar

  • Mott Macdonald

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Stephen Kirby

  • Talbot Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Talbot

  • S&R Construction Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Danny Scholes

  • Applebridge Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Tomas McGleenan

    Notes

    NERS = Excavation and backfill to tile tape level as relevant to cable lay scopes (Civil Works). GIRS = CNRB Scope restricted to work up to 2 Bar.

  • PN Daly Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Patrick Daly

  • EEMU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

  • Rogers Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Natalie Birch

    Notes

    Full Scopes Construction Only - Excludes Project Management

  • AIS Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Stuart Newton

  • W M Donald Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Rachel O’Donnell

  • FES Support Services Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Chris Mack

  • Balfour Beatty Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Notes

    Water enquiries Kathryn Vowles, contact details as above. Gas enquiries Willie Duncan, contact details as above.

  • Green Frog Utilities

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Green Frog Utilities

  • GW Cockburn Water and Drainage Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Mr Gary Collins

  • J McCann & Co Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDaid

  • Arcadis Consulting (UK) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Gareth Thompson

  • Severn Trent Services

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Nathan Beauchamp

  • Dumfries and Galloway Utility Company Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Ian Carruthers

  • United Living Water Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Chris Carolan

  • Luce Bay Plant Hire Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Avove Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Liz Groundland

  • Seivwright Brothers Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Alasdair Seivwright

  • J Murphy and Sons Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Sam Polley

    Notes

    Full accreditation for Substation Layouts (11kV, 20kV, 33kV – restricted to 33kV switchgear)

  • Global Infrastructure Scotland Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Tanya Bartlet

  • Special Pipeline Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mick Rice

  • Water Supply Surveys Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stephen Elliott

    Contact

    Kane Trayling

  • Water and Pipeline Services Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Donald Stocks

  • Interactive Contact & Resolution Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    Contact

    Richard Denny

  • Chapman Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Paul Chapman

  • Fulcrum - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Customer Care

  • Beehive Contractors Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Self-Lay Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Toby Judge

  • ARC-Tech MU Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Hunter

  • Connect It Utility Services Limited - MURS Accredited

    Regions Midlands, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ryan Leech

  • OCU Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    James Probert

  • WaterWise Utilities Ltd (formerly DS Construction (Scotland) Ltd )

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Nicol of Skene Ltd - MURS

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Peter-Jon Cowe

  • Cascade Water Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matthew Hedges

  • Billy Miller Contractor & Plant Hire

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Brad Robert Macleod

  • DaCI Utilities Engineering Consultancy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mohammad Hasan

  • Ian Moore Groundworks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • McAndrews Utilities and Civil Engineering

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean McAndrew

  • Morrison Data Services - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    ARMIM Temp disconnections/reconnections

    Contact

    Mr Matthew Barnes

  • Sustainable Energy Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andrew Holland

  • Utilities Direct Limited

    Regions East Anglia, Midlands, South East, South West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Loretta Gobbey

  • Entity Connect

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Gethin Davies

  • CONNECT3UK LTD

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Humphreys

  • Vital Energi Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim McNeilly

  • Pearce Elite Plumbing & Heating Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Matthew Duggan

  • Gattica Associates Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Mihaela Gafita

  • PJ Carey (Contractors) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Matt Larham

  • Sapphire Utility Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    John Glover

    Notes

    Partial Accreditation - Excavation and backfill to tile tape level (Civil Work) – as relevant Cable Laying – 20kV, 33kV

  • TriConnex Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Hannah Smith

  • UK Utility Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Tom Pitts

  • GS Energy Connections Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Danny Dunstan

  • AIM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Simon Barton

  • Energy Flow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Stuart Hunter

  • Swat Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Jake Pariente

  • Multi Connex Networks Ltd - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • MCU Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mick Coleman

    Notes

    NERS Cable Laying (LV) *restricted to hand pull only

  • Ipsum Power (ICP) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lucy Jarrett

  • AC Water Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Claire Lineham

  • Chap Group (Aberdeen) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neil Mutch

  • Stantec UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Paul Kalungi

  • Heneghan and Sons Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    James McDermott

  • PGL Pipelines Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Steve Davis

  • High Voltage Systems and Services (HVSS)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mark Buckby

    Contact

    Chris Beattie

  • Andrew Sinclair Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Design

    Contact

    Bruce Sinclair

  • Energetics Design and Build Limited - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Lee Crabtree

    Notes

    Civil Works associated with the following scopes: Cable Laying (LV, 11kV, 20kV) Cable Jointing (LV Dead, LV Live, 11kV, 20kV) Substation Installation (11kV, 20kV)

  • GF Job

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Ruaridh Stuart

  • Underground Solutions Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • Express Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CS - Construction of Services

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kerry McDade

  • Draper Civil Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    Contact

    Edward Parv

  • Anparo Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Adam Ferrand

  • GCB Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Craig Bennett

  • GasDesign Utilities Ltd Trading as GDUK (Utilities)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Andy Ginn

  • Hydro Utility Solutions Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Mr Tim Stork

  • E&H Building Contractors Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Drewie Manson

  • McFadden Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Sean Staines

  • USR Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

  • JSM Group Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Darren Cooper

  • Future Energy Networks Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Bret Murphy

  • Air Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Muhammad Asfund Yar Khan

  • Montore Construction Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Dan Sutton

  • JRF Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • Ingenious Power Engineering Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Jason Johnson

  • AS-Utilities Scotland Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Scott Peters

  • Domis Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Lee Dunn

  • ACS Multi Utility Ltd - MURS accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alister Cameron

  • Allan Munro Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Cameron Munro

  • Engage Services (ESL) Limited - WIRSAE

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    TDNHS

    Temp Disconnections & Re-Connections (up to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Neil Taylor

  • ML Water Solutions Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    Contact

    Richard Moffat

  • M&S Water Services (Utilities) Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Thomas Harkin

  • DAM Utilities Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

  • JN Civils Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Antony Livingstone

  • Shadow Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Friday Mafararikwa

  • Utilitest Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Alan Macmillan

  • Pressure Test scotland (Water) Ltd

    Regions Scotland

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    David Connell

  • PWG Connections Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Notes

    Network Connections Operational – LV and 11kV (includes 20kV) Network Connections Jointing – 11kV mains and 11kV Terminations (includes 20kV)

  • Advance Utilities (Scotland) Ltd - MURS Accredited

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    David Callaghan

  • Fincher Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

  • Hydrosave UK Ltd

    Regions Midlands, National, North East, North West, Scotland, South East, South West, Wales

    WIRS

    ARMIM All Routine Meter Installation Maintenance

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    ERMIM External Routine Meter Installation Maintenance

    Contact

    Mr Keith Lewcock

  • Pivotal Energy Ltd - MURS Accredited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Amie Norton

  • Network Plus Services Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Assurance Team

  • PTS Utilities Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Richard Paton

  • Amjutan Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Mr Justin Woodbridge

  • Morrison Construction Ltd

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Iain Mitchell

    Contact

    Drew Mackie

  • Skanska Construction UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

    Contact

    Raj Kumar

  • Hydrotech Water Services UK Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Vince Keenor

  • Bottom Groundworks & Plant Hire Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    CNRCC Construction Non-Routine Complex Mains Branch Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Brian Campbell

  • Flowaime Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Andrea Wright

  • Integrated Utility Services - MURS ACCREDITED

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Integrated Utility Services Ltd

    Notes

    Civil Works Associated with Cable Laying (LV, 11kV, 20kV, 33kV & 66kV)

  • WSP UK Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Tim Knobbs

  • Power On

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Design

    Contact

    Tim Erich

  • Bregan Mainsflow Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Glenn Brett

  • Davidson Land Services

    Regions Scotland

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CNRBC Construction Non-Routine Basic Branch Mains Connections

    Contact

    Malcolm Davidson

  • Balfour Beatty plc

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    Design

    Contact

    Steve Crossland

  • Nexus Utilities Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    John Gaughan / Stephen Gaughan

    Notes

    Administration September 2025

  • Ipswich Utilities Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CS - Construction of Services

    CRMC Construction of Routine Mains Connections

    Contact

    Jordan Thomas

  • Kier Integrated Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    KIS Proposals

  • Perch Verify Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

  • Complete Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Damon Goodwin

  • NG Tunnelling Ltd

    Regions East Anglia, South East

    WIRS

    CMS Construction of Mains and Services (all works)

    Contact

    Peter Gallagher

    Notes

    13/06/2024 Suspended

  • SmOp CT Ltd (trading as SmOp Cleantech)

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Craig Morton

    Notes

    Civil Works - Excavation and Backfill to Tile Tape Level

  • Dig & Connect Water Services Ltd.

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMA – Construction of Mains All

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Mark Aldous

  • Reach Active Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    PM

  • Bethell Utility Services Ltd - MURS Accredited

    Regions Midlands, North East, North West

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Design

    Contact

    Sarah Standish

  • Utility Solutions Provider Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Neal Cowdell

  • M Group Water (Network Infrastructure) Limited

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Andy Stephenson

  • M&J Utility Services Ltd

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    CRUPC Construction Routine Under Pressure Mains Connections

    Contact

    Jonathan Buxton

  • Occutrace Ltd - WIRSAE

    Regions East Anglia, Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    MIRMS

    Installation or replacement of meter in chamber/box up (to and including 40mm φ)

    ERMIM External Routine Meter Installation Maintenance

    TDNHS – Temp Disconnections & Re-Connections (up to and including 40mm)

    ERMIM - Temporary Disconnections and Subsequent Reconnections

    MIAES - Installation or replacement meter in existing chamber / inside building up to and including 40mm

    MIAEL - Installation or replacement meter in existing chamber / inside building over 40mm.

    Contact

    David McKenzie

  • Alconex Infrastructure & Solutions Ltd - MURS Accredited

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    WIRS

    CMS Construction of Mains and Services (all works)

    CRMC Construction of Routine Mains Connections

    Contact

    Kevin Wilkinson

Error

Error

No results found

No results found that match your query

Loading results

Approval Key

full approval

Full Accreditation is granted to Providers who have successfully demonstrated that they have adequately met the schemes requirements with respect to the construction of adoptable assets, these Scopes and Services are highlighted in green when fully accredited.

partial approval

Partial Accreditation is the first stage of accreditation showing Scopes and Services highlighted in blue. It demonstrates that a Provider has the required systems, processes, and procedures in place, but has yet to demonstrate these or is currently unavailable to offer work for surveillance to meet the requirements. Providers with partial accreditation can tender and obtain work for the scopes they hold.

approval due to expire

Scopes highlighted in yellow are fully accredited but are due to expire in less than one month.

gap analysis

Scopes highlighted in aqua are for GAP Analysis, meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval expired

Scopes highlighted in fuchsia have now expired or have been suspended.

bim ready

BIM Providers who can demonstrate that they have met the requirements of the BIM Guidance document and the referenced standards but do not currently have BIM projects against which they can demonstrate the implementation of those standards

    WIRS Scopes

    Design

    CMS Construction of Mains and Services - All works
    Covers off-site work and on-site work with pipe diameters over 355mm diameter

    CMS Construction of Mains and Services - Site works only
    Covers work on development sites with mains up to 355mm diameter

    CMS Construction of Services on Development Sites
    This scope covers service laying on connections not exceeding 63mm diameter (OD) including services to new on-site mains laid by others.

    PM
    Procedures in place to manage the work and use companies holding construction accreditation.