We’ve detected that you are using an outdated browser. This will prevent you from accessing certain features. Update browser

Client success stories.

Read a selection of our customer success stories

Case studies

  • Selected

Showing 50-60 of 63 results
Most relevant

Delivering ISO 45001 certification to DP World.

Date: 5 Aug 2020

DP World, UAE Region is a premier maritime hub offering integrated solutions to local and international businesses via its subsidiaries.

ISO 45001
Compliance & Certification
Health & Safety

Shell: 3D printing quality assurance case study

Date: 13 Jun 2022

Risk Through a New Lens: LRQA is supporting Shell with assurance solutions for safety-critical 3D printed parts.

BAE Systems: Elevating operational excellence and employee well-being

Date: 23 Oct 2023

Partnering with LRQA for ISO 45001 certification and ISO 45003 guidance, BAE Systems Rochester has always been at the forefront of innovation and their commitment to continuous improvement and employee welfare hasn’t wavered.

Manufacturing
Health & Safety Assurance
ISO 45001
ISO/FDIS 45003

Case Study: Hill International gets certified for ISO 19650 (BIM)

Date: 18 May 2023

Hill International, UAE achieved their ISO 19650 certification from LRQA. This demonstrates Hill's building information modelling system follows a robust and globally recognised approach.

Case Study
Construction Industry

Terex Trucks: Setting industry firsts for enhanced business.

Date: 22 Jan 2018

Setting industry firsts. Certification to revised quality and environmental standards, ISO 9001:2015 and ISO 14001:2015. Read more in our case study.

Manufacturing
Construction Industry
Environment
ISO 14001

Helping NGO, Terre de Hommes, help children globally.

Date: 22 Jan 2018

Helping Terre de Hommes help children globally. Certification to ISO 9001:2015 redesigns the NGO’s operating structure. Read more in our case study.

Aerospace & Defence
Food, Beverage & Hospitality
Marine & Shipping
Utilities

Turboden:Taking risk-based thinking into clean electricity generation.

Date: 22 Jan 2018

Taking risk-based thinking into clean electricity generation. Certification to ISO 9001:2015 to better identify risks and opportunities. Read our case study.

Providing Engineering Support to the SCHOTTEL Hydro Triton Tidal Power

Date: 22 Nov 2017

Taking designs further to harness tidal power, Bay of Fundy. Structural analysis, design codes and standards review. Read more in our case study.

Case Study
Energy
Wave & Tidal
Sustainability

Meeting global specifications

Date: 22 Nov 2017

ISGEC supplies the domestic Indian market and exports its products globally. Key to the group’s leading status is establishing, maintaining and demonstrating a rigorous commitment to quality.

Case study: Design review of tidal turbine (Atlantis Resources)

Date: 22 Nov 2017

Pushing the potential of tidal power. Design review and survey of the world’s largest rotor diameter tidal turbine, Orkney. Read more in our case study.

Case Study
Energy
Wave & Tidal
Sustainability
Can't find what you are looking for?

Hit enter or the arrow to search Hit enter to search

Search icon

Are you looking for?