Skip content

Below you will find a list of NERS accredited providers (commonly known as Independent Connection Providers (ICPs)). Depending on their scope, an NERS provider can carry out work such as design new connections to the network, dig and fill trenches on and around the property to be connected, and install electrical switches and transformers.  Find out more about the scopes of NERS accreditation here.

Use "Refine results" to search on specific criteria such as scope.

Find a NERS accredited Independent Connection Provider (ICP)utilligence

1 1 1 results

Filter by

  • Utilligence Ltd

    Regions Midlands, North East, North West, Northern Ireland, Scotland, South East, South West, Wales

    DNO Electricity North West Ltd, Northern Powergrid, Scottish and Southern Energy, ScottishPower Energy Networks, UK Power Networks, Western Power Distribution

    NERS

    Electrical Design of Distribution Networks Covering

    HV Cable Networks

    20kV

    33kV

    132kV

    66kV

    11kV

    S/Station

    33kV

    132kV

    66kV

    20kV

    11kV

    LV Cable Networks

    LV

    Self-Determination of Point of Connection (POC)

    20kV

    11kV

    Jointing

    LV Dead - PM

    20kV - PM

    33kV - PM

    66kV - PM

    132kV - PM

    11kV - PM

    Cable Laying

    66kV - PM

    LV - PM

    20kV - PM

    33kV - PM

    132kV - PM

    11kV

    Civil Works

    Civil Works - PM

    Substation Installation

    33kV - PM

    132kV - PM

    66kV - PM

    20kV

    11kV

    Contact

    Benjamin Lois

Error

Error

No results found

No results found that match your query

Loading results

Approval Key

full approval

Scopes highlighted in green are fully accredited.

partial approval

Scopes and Services highlighted in blue are for partial approval meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval due to expire

Scopes highlighted in yellow are fully accredited but are due to expire in less than one month.

gap analysis

Scopes highlighted in aqua are for GAP Analysis, meaning the company has the required systems and procedures to do the work but has yet to demonstrate these or is currently unavailable to offer work for surveillance.

approval expired

Scopes highlighted in fuchsia have now expired or have been suspended.

bim ready

BIM Providers who can demonstrate that they have met the requirements of the BIM Guidance document and the referenced standards but do not currently have BIM projects against which they can demonstrate the implementation of those standards

    Civil Works
    Excavation & Backfilling up to tile/tape level.

    O/Head
    Overhead.

    S/Station
    Substation.

    PM
     The NERS Provider does not have the capability to carry out any registered scopes of work directly but has demonstrated the competence to project manage work subcontracted to a NERS Provider registered to undertake the subcontracted scope.