ASME Guidance: to help your organisation receive ASME Certificate Authorisation.
Find out how to apply.
Overview
This article gives you key information about how to get an ASME Certificate of Authorisation and Certification Mark for non-nuclear Code Sections. The organisation applying for Certification is the 'Applicant'. After getting the Certificate the Applicant will become a 'Manufacturer'.
What do I need before I apply?
At the time you apply, you need to have an inspection contract or agreement in place with an Authorised Inspection Agency (AIA) like LRQA.
Crucially, you'll need to establish and implement a Quality Control System (QCS) to meet all Code requirements if you don't already have one. Included in this QCS should be:
- Procedures for welding, NDE, hydrostatic test, heat treatment, and calibration;
- Demonstration of NDE procedures to the AI;
- Qualification of NDE and welding personnel;
- Material;
- Design;
- Fabrication;
- Examination (by the Manufacturer);
- Inspection (by the Authorised Inspector (AI) of the AIA);
- Pressure testing;
- Stamping and Certification.
The AIA may assist you in developing a written description of the QCS (mostly a manual). The manual is subject to the acceptance by the AIA's Authorised Inspector.
A Guide for ASME Review Teams will be provided by ASME to you to help cross reference the paragraphs in your manual with the applicable control requirements of the Code. You'll have to fill it prior to the Joint Review. It gives an impression what elements to be considered in the QCS.
Also, you will need the appropriate ASME Code Books for the type of certificate you're applying for. They can be found here. The books may be obtained in both hard and electronic copies from ASME directly or from authorised re-sellers.
How do I submit the application?
ASME's CA Connect website lists current ASME certificate holders and also allows new applicants to submit their applications. The application should be submitted through CA Connect at least six months prior the scheduled review date. ASME processes the order only after receiving the application forms and fees.
Application Forms and Price Information can be downloaded here.
Or it can be applied online via 'CA Connect'.
An application has to be submitted for Authorisation to Register (Data Reports) to the National Board of Boiler and Pressure Vessel Inspectors. Instructions can be found here.
What's the Joint Review?
The Joint Review is done with the ASME Designee and the AIA.
The review normally lasts one and a half day and is performed in following phases:
- The manual review will take about a half day and will be conducted separately from the applicant's premises by the ASME Review Team along with the AIA representatives only;
- Opening meeting;
- A brief shop tour;
- Discussion of manual comments;
- Implementation of software;
- Implementation of hardware;
- Private team meeting to find a recommendation regarding issuing or not issuing the Certificate;
- Exit meeting.
The team recommendation goes to the Committee on Boiler & Pressure Vessel Conformity Assessment (CBPVCA) who has the responsibility to issue or nor not issue a Certificate.
Given the importance of the Joint review, a Pre-Joint Review should be performed by your AIA and yourself to verify the implementation of the QCS and the conformity of the demonstration item.
The team recommendation goes to the Committee on Boiler & Pressure Vessel Conformity Assessment (CBPVCA) who has the decision to issue or nor not issue a Certificate.
Want to know more about our services?
CASE STUDIES
-
NetSecurity Strengthens SOC Maturity with SOC-CMM Certification in Partnership...
Case Study
Discover how NetSecurity reached SOC-CMM Risk-Driven maturity with LRQA, improving incident response, governance and alignment with ISO 27001.
See SOC-CMM in action -
McDonald's and LRQA - turning food safety risk into...
Case Study
For over 25 years, McDonald’s has partnered with LRQA, beginning with supplier audits and evolving into a comprehensive,...
Read more -
Driving confident investment decisions
Case Study
Learn how LRQA helped Goldman Sachs Asset Management (GSAM) portfolio companies to assess risk and build resilience.
Read more -
EHS Achieves ISO 42001 AI Management System Certification with...
Case Study
Emirates Health Services becomes the first to achieve ISO 42001 AI Management System certification with LRQA, emphasizing AI...
Read more -
EHS Achieves ISO 42001 AI Management System Certification with...
Case Study
Emirates Health Services becomes the first to achieve ISO 42001 AI Management System certification with LRQA, emphasizing AI...
Read more -
Thrust Carbon ISO 14083 Verification Case study
Case Study
Award-winning green tech start-up, Thrust Carbon, explains what it means to be among the first organizations to have...
Read more -
Trelleborg Marine Engineering - ISO 50001 certification case study
Case Study
Read more on how Trelleborg Marine Engineering (Qingdao) Co Ltd improved energy management and reduced emissions with ISO...
Read more -
Providing SOC cyber security services to a top 10...
Case Study
This client is one of UK’s largest banks, ranking within the top 10 in Europe for market capitalisation,...
Read more -
Otto and Sons and LRQA - Showcasing best practice...
Case Study
LRQA’s Farm First assurance scheme has supported OSI Group’s subsidiary in achieving their goals of enhancing food safety,...
Read more
INSIGHTS
-
We don't need another methane pledge. We need action.
Article
Cutting methane emissions is one of the fastest ways to slow global warming. Discover why COP31 must move...
Read more -
A carbon label next to the nutrition label?
Article
Explore how climate labeling, carbon accounting, and independent verification can help consumers identify lower-carbon food products while rewarding...
Read more -
On thin margins, cutting carbon is how farms...
Article
Discover how low-carbon farming practices can reduce emissions, protect farm profitability, and strengthen agricultural resilience as EcoEngineers, an...
Read more
EVENTS
-
Webinar: 2026 Rewind, 2027 Ready: Cyber, AI & Resilience
Event
Join LRQA's experts on 3 December to explore key cyber security, AI and resilience trends from 2026 and...
Register for webinar -
Webinar: Supply Chain Data to Decarbonization:
Event
Discover why supplier environmental data isn't delivering emissions reductions and how integrated carbon, water and chemical management can...
Read more -
Webinar: Supplier emissions and scope 3 reporting
Event
Discover why supplier emissions reductions go unreported in Scope 3 inventories and how better data, allocation and verification...
Read more