Risk monitoring for EDF Energy
Seeing the full risk picture at Sizewell B. Integrated consultancy, advisory and software support for risk monitoring. Read more in our case study.
Training for Huadian Heavy Industries
Designing and delivering bespoke training with the RES Group for a leading Chinese EPC contractor. Read more in our case study.
Case study - Maintenance cost and risk reduced by 55%.
Maintenance cost and risk reduced by 55%.
Katoni: Make health and safety matter.
Katoni achieves ISO 45001 with LRQA. This case study states the preparation process from OHSAS 18001 to ISO 45001 Katoni took for a successful migration.