Rig Inspection Workshop Land Rigs LRQA Energy
The Training Academy’s Rig Inspection Workshops aim to reduce your business risk and improve the efficiency of your staff and organization.
Dynamic positioning closed bus configuration
This document provides guidance to clients on the use of closed bus-ties in dynamic positioning (DP) systems. The document is generic and is based on our extensive experience of DP installations and a consultation conducted with industry practitioners. The approach required by LRQA will be a risk-based process that produces an assurance case. An assurance case is a reasoned and compelling argument, supported by a body of evidence, indicating that a closed bus-tie system will operate as intended for a defined application in a defined environment.
Inspection of water mist nozzles
AMENDMENTS TO THE REVISED GUIDELINES FOR THE MAINTENANCE AND INSPECTION OF FIRE PROTECTION SYSTEMS AND APPLIANCES (MSC.1/CIRC.1432)
Future IMO and ILO Legislation
We produce documents for the various International Maritime Organization (IMO) Committee and Sub-Committee meetings, these include, Agenda Previews, Summary Reports and Future IMO Legislation documents.
LRQA doctoral candidate presents leading offshore wind research
Marco Sepulveda, an LR-sponsored Engineering Doctorate student with the Industrial Doctorate Centre for Offshore Renewable Energy (IDCORE), is based in our Aberdeen office under the supervision of Dr Mark Spring and Prof Peter Davies. Marco’s Doctorate, which he will complete next year, focuses on wind turbine reliability. In recent months, Marco has presented papers and posters at a number of major industry conferences in collaboration with LR.
NVQ Level 4 Qualification Structure
NVQ/SVQ IN GAS NETWORKS ENGINEERING MANAGEMENT LEVEL 4 QUALIFICATION STRUCTURE OVERVIEW
Arc Flash guidance
This guidance document is structured to introduce the concept of arc flash. The various components of the subject are described in detail. These components include the nature of an arc flash event, as well as its effects on the surrounding environment and any personnel operating in that environment. The methods used for carrying out an analysis are discussed in detail. The guidance document identifies the various mitigation techniques used to protect personnel and assets from the effects of arc flash. In summary, this report attempts to consolidate the subject of arc flash by identifying what an arc flash actually is, its cause, its impact on assets and human life, and the calculations required for a comprehensive arc flash study (as described in the various industry-recognised guides). It also provides some guidance on when a study should be submitted to comply with LRQA’s (LRQA's) rule requirements.
Marine and Offshore: Shaping the future, delivering solutions today
LRQA is a leading international provider of classification, compliance and consultancy services to the marine and offshore industry, helping our clients design, construct and operate their assets to the highest levels of safety and performance.
RCC-M nuclear code training RCC-M: Introduction to the RCC-M code
RCC-M is the design and construction code for the European Pressurised Water Reactor (EPR) nuclear island mechanical components. Suppliers wishing to enter the UK Nuclear New Build programme will be required to be familiar with this code.
RCC-M nuclear code training: RCC-M Requirements for procurement of parts and products
RCC-M is the design and construction code for the European Pressurised Water Reactor (EPR) nuclear island mechanical components. Suppliers wishing to enter the UK Nuclear New Build programme will be required to be familiar with this code.